Meridian manages power for AI data centers.

AI is built out of power.

Meridian is how data centers get it.

The number to file.

0MW
0.0%risk
024487296
40 MW left unallocated

We find what can turn off.

0 / 7
A parcel and a slab
  1. 1
    Switchyard
  2. 2
    Meter & switchgear
  3. 3
    Firm hall
  4. 4
    Flexible hall
  5. 5
    Cooling
  6. 6
    Backup generation
  7. 7
    Battery

Flexibility pays.

0MW flexible
024487296
$0$0a year
4CP$0$0$42k$72k per MW
Reserves$0$0$50k$100k per MW
ERCOT and TDSP tariffs, 2026. Reserves and ERS do not stack.

Existing sites

Income from flexibility. Uptime untouched.

New sites

Firm and flexible declared. Connected in phases under SB 6.

Meridian makes power dynamic.

0hours
0events
no windowthis week

Tell us about your site.